HomeGuides › GPSR Amazon 2026

GPSR Amazon 2026: requirements, deadlines and what changes

Since 19 February 2026 the GPSR is fully enforceable in Germany via the amended ProdSG — and Amazon enforces it through Manage Your Compliance: without a verified Responsible Person, ASINs are deactivated automatically, sometimes EU-wide.

What Amazon requires in 2026

2026 deadlines for importers

DateRuleWho it affects
13 Dec 2024GPSR (EU 2023/988) appliesall in-scope products
28 Dec 2024USB-C charging duty (RED, EU 2022/2380)electronics importers
19 Feb 2026ProdSG amendment: §28 fines, local-language dutyall sellers/importers
28 Apr 2026USB-C duty for laptopslaptop importers
06 Aug 2026Tightened REACH formaldehyde limitsfurniture/wood/textile/electronics

A sourcing problem, not a listing problem

Responsible Person, warnings, REACH limits and USB-C are properties of the goods themselves — not fixable after delivery. The control point is before the order.

Check 5 products before you buy

Greenlist shows you the relevant test paths, the open evidence gaps and the questions for your supplier — per SKU, before the PO. Greenlist drafts the document-solvable evidence (declaration of conformity, RoHS DoC, listing block) and tells you where accredited lab testing is required.

Check 5 products →
Greenlist identifies regulatory test paths, documentation gaps and formal evidence risks based on the product data entered. No confirmation of conformity, no final assessment of measurement results, no substitute for accredited testing, a notified body or legal advice.

Frequently asked questions

01What does Amazon require for GPSR in 2026?+
A verified Responsible Person in the compliance information, safety notices in the local language and documentation in the dashboard. Without these, ASINs are deactivated.
02Is there a new GPSR deadline in 2026?+
The GPSR applies since 13 Dec 2024; the key 2026 date is the ProdSG amendment of 19 Feb 2026, plus USB-C for laptops (28 Apr 2026) and REACH formaldehyde (06 Aug 2026).
03What changes for GPSR in 2026 specifically?+
Authorities can sanction directly (up to €100,000), warnings must be in the local language, and authorities can instruct marketplaces.
04From when do the new REACH formaldehyde limits apply?+
From 06 Aug 2026. Wood max 0.062 mg/m³, other products max 0.080 mg/m³. Import counts as placing on the market — existing stock is affected too.

Read more

GPSR fines & warningsElectronics/chargerAmazon listing blocked